The DuraPatcher is the most cost effective method of road repair by using less expensive materials and reducing labor cost per ton of patching. In addition, using this method adds to laborers' safety by greatly reducing their exposure to oncoming traffic. We simply get the job done faster using superior performance materials.

The multi-million dollar Strategic Highway Research Program (SHRP) has acknowledged that our spray-injection method has the longest lasting patches of all other methods they have researched.

The following example shows the typical costs of road repair projects in most areas of the United States. Costs may vary somewhat in your area, so please fill in the examples below with your figures to see how much you will save using the DuraPatcher.

 

Hot or Cold Mix Patching Method

Project requiring 10 tons of material
Daily output: 5 tons

Patching cost per 8-hour day
1 Dump truck @ $30/hour x 2 days = $480.00

3 Men @ $10/hour x 2 days = $480.00

10 Tons of hot mix or cold mix @ $35/ton = $350.00

Total = $1310.00

Cost per ton ($1310 / 10 tons): $131.00 per ton

* Failure rate of 50% not figured in the above example.

The DuraPatcher Method

Project requiring 10 tons of material
Daily output: 10 tons

Patching cost per 8-hour day
1 Dump truck @ $30/hour = $240.00

2 Men @ $10/hour = $160.00

1 DuraPatcher @ $80/day = $80.00

9 Tons of rock @ $8.00/ton = $72.00

1 Ton of CRS2 Emulsion (255 gallons @ $0.50/gallon) = $127.50

Total = $679.50

Cost per ton ($679.50 / 10 tons): $67.95 per ton